Our client required Absolute Land Ltd to undertake ongoing monitoring of a construction site located on reclaimed land.
The part of the property where the building would be built was placed under pressure by having a 3 metre high area of fill placed on it. The site had a series of 26 monitoring pins located with the building area, and was required to be monitored, recorded and displayed on a chart, on a fortnightly basis.
Please contact us to discuss all your monitoring needs.